Case Study
Our clients water tank was past its useful life, it was over capacity, leaking and corroding internally on the steel fixings. They chose a complete water tank replacement over a refurbishment as the tank was over 25 years old.
Cold Water Storage planned and executed the project with great results. Here is a summary:
- Install a temporary sectional tank. This was erected in the available space in the plant room and then piped into the current boosted water system.
- Bypass the older tank and then drain it down, strip it out and dismantle it.
- Build the new water tank with two compartments and dual pipework (allowing for uninterrupted maintenance).
- Commission the new water tank into service and then dismantle and remove the temporary tank from site.